Gabe and Damon used the laser level to sight the sensor placement and then Damon drilled holes in the side hulls where the sensors should attach. Gabe and Joe just laminated reinforcements on those holes and Joe showed off the sensor bearings, which will fit in those holes.
1. The foil cassette panel, which supports the point-loading of the lower rollers using a core, which is a combination of airex foam and 1.5mm thick webs of carbon spaced 12mm apart.
2. Sea anchor deploy tunnel, which connects to and also drains the dry well storage area.
3. Secondary filleting and taping of the inboard ama hull halves.