1. The foil cassette panel, which supports the point-loading of the lower rollers using a core, which is a combination of airex foam and 1.5mm thick webs of carbon spaced 12mm apart.
2. Sea anchor deploy tunnel, which connects to and also drains the dry well storage area.
3. Secondary filleting and taping of the inboard ama hull halves.